Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13621650

- Product Categories
- Friendly Links
Information Name: | Three-phase gasoline generator 5kw |
Published: | 2014-12-05 |
Validity: | 10000 |
Specifications: | |
Quantity: | 471.00 |
Price Description: | |
Detailed Product Description: | Three-phase gasoline generator 5kw Shanghai Ito diesel generator set powered by diesel Ito Shanghai Diesel Engine Co. Domestic production of 135 series diesel engine is a development of the earliest, most widely used models, Shanghai Ito mature technology diesel generator sets, spare parts and easy purchase, power range. There are vertical four-cylinder, vertical 6-cylinder, V-12 cylinder, power 50KW-300KW. Shanghai Diesel Generator Set products especially for the best Shanghai Diesel Engine Co., Our company is an OEM partner Ito shares, Shanghai Ito diesel generator sets all the supporting Dongfeng Cummins Diesel shares. Product Code YT6500DC (S) frequency 50HZ Rated voltage 220V 5KW maximum rated power output of 12V DC power 5.5KW 23A rated current Phase Single / three phase noise level (7M) 70 starting hand starting Fuel tank capacity 25L Net Weight (KG) 88 Engine Model EM390 Engine Type Four-stroke engine maximum power 9.5KW class F insulation displacement 420CC fuel type unleaded gasoline 90 # 90 # fuel oil volume 1.1L unleaded gasoline fuel consumption 540G / H continuous working time 9hrs size (MM) 680 * 510 * 560 5kw three-phase gasoline generator maintenance: 1. Check the unit equipment installation is solid, the parts feeder is solid; 2, check whether the normal daily oil tank, tank and pipeline leaks interface; 3, check expansion tank water level, water quality is normal, as the case may add cooling water or DCA rust; 4, check the starter battery unit level, the voltage is normal, as the case may add; 5, check the oil level unit, oil is normal , optionally added; 6, check the intake air resistance indicator, as the case purged clean; 7, check generator voltage output end of the air switch is disconnected; 8, start test operation, the unit checks various operating conditions, and Record of the technical data; 9, check unit control cabinet lights, whether the individual instruments work, internal wiring is good; 10, clean the parts and generator set control cabinet surface dust and dirt. |
Admin>>>
You are the 5200 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Industrial Co., Ltd. Arts and transcripts All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5200 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Industrial Co., Ltd. Arts and transcripts All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility